Skip to content
Licensed hazardous and liquid waste carriers

Tank capacity, waste code and licensed facility: planned together.

For licensed companies collecting waste from industrial plants, organised industrial zones, fuel stations and workshops. Plans which vehicle collects which waste codes in which order and delivers to which facility, together with tank capacity, incompatible wastes and delivery deadlines.

Tank full mid-route: detour to facility, empty returnTrips split by capacity; no empty return

Tank capacity sets the routeSchematic neighbourhood. Two waste codes, one licensed facility. Today: the tank fills mid-route, forcing a detour to the facility and an empty return. With Akılkent: trips are split by tank capacity and incompatible codes travel on separate trips.tank fullDepotLicensed facility
Today: unplanned returnsWith Akılkent: trips by capacity■ waste code 1   ▲ waste code 2 (cannot share a tank)

Every load is recorded; the route is still in the driver's head.

In licensed transport every loading and unloading is entered into the Ministry's mobile waste tracking system, and a positioning device is mandatory in the vehicle. The route exists as data but not as a plan. The tank fills mid-route, the vehicle detours to the licensed facility and returns empty; a waste code that cannot share the tank gets a second trip.

Regulation fixes three rules: wastes may not be mixed, unloading only at a licensed facility, and if the facility refuses the load the vehicle is redirected. In practice a deadline for delivery after loading and tank cleaning when switching waste types are also required. When these rules are not planned, the cost shows up not as kilometres but as vehicles and days.

Delivery deadline after loading, as required in practice
10 days
Hazardous waste that may travel without a licensed vehicle
under 50 kg
Records per trip
3 codes loading, delivery, unloading

Sources: the Waste Management Regulation, the Communiqué on Road Transport of Waste and the Ministry's system presentation. The delivery deadline appears in the sector opinion on the draft communiqué and in provincial checklists; the current condition in your licence file prevails.

What does the route plan take into account?

RuleWhat it means
Vehicle and waste code compatibilityEach point is assigned only to a vehicle licensed for that waste code.
Incompatible wastesCodes that cannot share a tank or compartment go on separate trips; cleaning time and cost between them enter the plan.
Tank and body capacityTrips are split so the tank is full at the facility; no mid-route filling or empty returns.
Delivery deadlineThe deadline for delivery after loading is the upper bound of the multi-day plan.
Licensed facilityUnloading only at a facility that accepts the code, within its working hours.
Facility refusalA backup facility and re-planning for a refused load.
Driver and vehicle qualificationADR-certified drivers and vehicles within the licence age limit, assigned as qualification constraints.
Working hoursDriving and rest periods and the shift limit are in the plan.
One day's trip planSchematic area: squares are the first waste code, triangles the second. Three trips; each ends at the licensed facility when the tank is full, and the incompatible code travels separately.DepotLicensed facility
Trip 1: waste code 1, to the facility when fullTrip 2: waste code 1Trip 3: waste code 2, separate tank■ waste code 1 · ▲ waste code 2

How we work

  1. Point list and waste codes

    The loading points, waste codes and estimated quantities in your tracking system are enough. No new record system is set up.

  2. Vehicles and facilities

    Vehicle licences, tank and compartment capacities, the facilities you work with and their acceptance hours are defined in the interface.

  3. Weekly trip plan

    Which vehicle, which day, which points, which facility. Distance, time and fuel per vehicle; the next points on the driver screen.

Getting started

Akılkent's route solver was validated with real data in municipal solid waste operations; the same core runs with this sector's rules. The constraints above are defined for your operation in the first conversation and computed with your own data in the free pre-analysis. We review the results together and, if it fits, start with a trial in one area.

See it with your own data

With your vehicle list and point locations we compute the savings potential of your operation and review the result together. A request is not a purchase commitment.

Request a free pre-analysis