If you pay for the vehicle, you pay for every extra kilometre.
For parcel and courier fleets, municipal sanitation contractors, organised industrial zones, packaging waste and recycling collectors, and water, gas cylinder and food distribution fleets: delivery planning and vehicle routing. Complete the same stops with fewer vehicles, fewer kilometres and within the shift.
3 vehicles; waiting and overtimeSame stops with 2 vehicles, within the shift
Paid per vehicle-day; the gain is in vehicle count.
Most municipal sanitation tenders follow a vehicle hire model: the contractor is paid per vehicle type and day, while fuel and route efficiency set its own margin. Doing the same work with one vehicle fewer is a direct gain. Organised industrial zones must set up their own collection system under the zero waste regulation; in distribution fleets every stop is a time window, and waiting costs driver hours.
Case studies published in peer-reviewed journals in Türkiye show route optimization cutting fuel in collection operations by up to a quarter; the classic literature has said "at least five to ten percent" for thirty years. Your result depends on your vehicles, area and stops; the pre-analysis computes exactly that with your own data.
- Fuel and distance reduction in published Turkish cases
- 13–25%
- Diesel, Istanbul, 10 October 2026
- 96.60 TL/litre
- Maximum daily driving for heavy vehicles
- 9 hours
Sources: municipal waste collection cases in Transportation Research Part D (2025) and open-access publications of Turkish universities; the current fuel price report; Highway Traffic Regulation art. 98/A. Case results belong to other operations and are not a guarantee.
What does the route plan take into account?
| Rule | What it means |
|---|---|
| Driving and rest periods | A 45-minute break after 4.5 hours of driving; at most 9 hours of driving in 24. The plan stays within these limits. |
| Shift | Daily working time and the night shift limit; no plan that spills into overtime. |
| Capacity and unloading trips | When full, the vehicle goes to the transfer station or facility and continues its route; the trip time is in the plan. |
| Time windows | Industrial zone shift hours, customer acceptance hours and container access hours are defined per point. |
| Depot and unloading point | The depot and the facility need not be the same place; several depots and facilities are planned together. |
| Many short stops | Hundreds of deliveries per courier: stop time, parking and walking distance enter the plan; a retry is planned for undeliverable parcels. |
| Backhaul | Empty water bottles, gas cylinders and crates in distribution, and return parcels in courier work, are collected on the same route. |
| Road restrictions | One-way streets, U-turn bans and heavy vehicle restrictions come from the real road network. |
| Different vehicles and frequencies | Small and large vehicles in one plan; daily and weekly stops in one weekly schedule. |
How we work
Stop list and vehicles
Stop addresses, estimated quantities, the vehicle list and working hours. If you have a tracking system, past kilometres are used for comparison.
Pre-analysis report
Your current routes and the planned routes are compared by vehicle, kilometres and time. You see your own result before deciding.
Trial and rollout
A trial of a few weeks with one vehicle and one area; planned and actual kilometres are measured. The service continues on a monthly subscription.
Getting started
Akılkent's route solver was validated with real data in municipal solid waste operations; the same core runs with this sector's rules. The constraints above are defined for your operation in the first conversation and computed with your own data in the free pre-analysis. We review the results together and, if it fits, start with a trial in one area.
See it with your own data
With your vehicle list and point locations we compute the savings potential of your operation and review the result together. A request is not a purchase commitment.
Request a free pre-analysis